Duplexes and apartments are for sale in Oba, Alanya, with 1+1 to 3+1 layouts across 65 to 195 sqm. The 4-block, 4-floor project occupies a 6,581 sqm site and includes both apartment homes and split-level duplexes. Shared facilities include an on-site cinema, indoor and outdoor pools, fitness spaces and a beach shuttle. Construction is scheduled from December 2024 to May 2027.
Quick facts: 1+1 to 3+1 apartments and duplexes, 65-195 sqm, 4 blocks, 4 floors, completion scheduled for May 2027, sea 3 km away.
Which homes are available, and how do they differ?
The selection combines apartments and duplexes in 1+1, 2+1 and 3+1 layouts. Apartment options range from 65 to 150 sqm for the 1+1 and 2+1 plans, while the 3+1 apartment is 144 sqm. Duplex options begin at 86 sqm for 2+1 homes and extend to 188 sqm for 3+1 homes.
Duplexes provide split-level living across the stated size range, while apartments offer single-level home formats. Balconies and terraces are included among the project features, alongside open-kitchen and separate-kitchen arrangements. Built-in kitchens, kitchen cabinets, granite worktops, ceramic floors, PVC windows and shower cabins are also specified.
What shared facilities are planned on site?
The project combines swimming, wellness and indoor leisure facilities. An outdoor pool, indoor pool, jacuzzi, sauna, Turkish Hamam, steam room, salt room and massage room form the wellness offering. Fitness, table tennis and a cinema provide additional indoor activity spaces.
For everyday use, the site includes a garden, children's playground, lobby, elevators, parking lot and generator. Security cameras and 24/7 security are also listed. A beach shuttle is included among the shared services.
How close are key local points?
The sea is stated at 3 km from the project, while a hospital is 1 km away. A primary school and supermarket are each 500 m away, and the university is 1.5 km away. Alanya Centrum is 4 km away.
What is the current displayed price range?
The current displayed project range is €169,000 to €595,000. Within the unit mix, the available choices cover compact 1+1 apartments through larger 3+1 apartments and duplexes. The project timetable states a December 2024 start date and a planned completion date of May 2027.