These apartments and duplexes for sale in Altintas, Antalya provide modern residential options across two 5-storey blocks. Set on a 3,400 sqm land plot with communal pool views, the development features diverse floor plans spanning 35 to 160 sqm. Prices currently range from €87,000 to €260,000.
Floor plans from 35 to 160 sqm and interior finishes
The development offers a selection of single-level apartments and split-level duplexes designed for different living arrangements:
- 1+0 apartments: 35 sqm living area
- 1+1 apartments: 60 sqm one-bedroom layout
- 1+1 duplexes: 60 sqm one-bedroom split-level layout
- 2+1 duplexes: 80 sqm two-bedroom split-level layout
- 4+1 duplexes: 160 sqm four-bedroom split-level layout
Every home includes an open kitchen equipped with kitchen cabinets, a built-in kitchen setup, and granite kitchen countertops. Interiors feature ceramic floor finishes, PVC windows, private balconies, and fully fitted bathrooms with shower cabins.
Communal wellness spaces, fitness, and swimming facilities
Residents share a central swimming pool with poolside lounging areas overlooking open pool views. Dedicated wellness facilities include a traditional Turkish hamam and an on-site sauna for relaxation. A fully equipped fitness room provides daily workout space within the complex.
How far is the project from the sea, daily shopping, and local airports?
Situated in Altintas, the property offers direct access to retail, healthcare, and regional travel routes. Daily essentials are convenient with a supermarket located 500 m away. Healthcare services are close by, with a hospital situated 1 km from the development.
Beach access and leisure along the sea are 8 km away. For air travel, Antalya Airport is 1 km from the project, while Gazipaşa Airport is located 170 km away.
Two-block architecture across 3,400 sqm of land
The complex consists of 2 residential blocks rising across 5 floors on 3,400 sqm of grounds. Building utilities include passenger elevators serving all residential floors, a generator for continuous electrical support, and round-the-clock 24/7 security monitoring.
FAQ
When is the development scheduled to begin construction and complete handover?
Construction begins on 11 May 2026, with final project completion and handover scheduled for 2 February 2028.
What on-site vehicle parking options are available for residents?
The complex provides dedicated parking infrastructure comprising both a sheltered garage and an open parking lot.