Apartments and duplexes for sale in central-alanya, Turkey, offer 1 to 3-bedroom living options positioned 600 m from the sea. The development spans unit sizes from 55 to 155 sqm across two blocks. Prices currently range from €160,000 to €375,000.
Unit options and interior appointments in Central Alanya
The project provides three distinct living arrangements: 1-bedroom apartments (1+1) ranging from 55 to 58 sqm, 2-bedroom apartments (2+1) from 72 to 80 sqm, and 3-bedroom duplexes (3+1) from 120 to 135 sqm. Overall unit sizes extend from 55 to 155 sqm, catering to varied space requirements.
Each interior is delivered with an open kitchen featuring built-in cabinetry, granite countertops, and included white goods. Bathrooms are fitted with a shower cabin and jacuzzi, while hot water is supplied via an electric water heater. Living areas are finished with ceramic flooring and PVC windows, opening onto balconies or terraces, and incorporate a smart home system for integrated control.
On-site swimming, fitness, and children's play spaces
The development includes communal wellness and leisure amenities, including an on-site swimming pool, a sauna, and a dedicated fitness room. For outdoor gatherings, the grounds provide a gazebo and a barbecue area. Families can make use of dedicated play spaces, including an outdoor children's playground and an indoor children's playroom.
How far is the development from the sea, schools, and airports?
The development is situated 600 m from the sea in Central Alanya. Daily educational and healthcare services are located within close reach, including a primary school at 142 m, a pharmacy at 300 m, a hospital at 1 km, and a university at 4 km. For regional and international transit, Gazipaşa Airport is 45 km away, while Antalya Airport is located 125 km from the project.
Structural layout across two 10-storey blocks on 2,966 sqm
The project occupies a 2,966 sqm land plot and consists of 2 blocks rising 10 floors each. Vertical transit between floors is serviced by on-site elevators, while a power generator and a central satellite system maintain uninterrupted building utilities. Security monitoring operates 24/7 with camera surveillance, supported by a full-time caretaker on the premises.
FAQ
What is the development schedule for the project?
Construction begins on 30 November 2026, with project completion scheduled for 30 December 2028.
Is vehicle parking available on site?
Yes, the development includes a dedicated on-site parking lot on the grounds.