These apartments for sale in Altintas, Antalya, Turkey, provide residential living spaces across a 10,500 sqm development site. The project stands 500 m from the sea and features two 12-storey residential blocks offering homes from 82 to 138 sqm. Current prices range from €199,000 to €349,000.
Apartment living spaces and interior fittings in Altintas
Apartments in this Altintas development range from 82 to 138 sqm of living space. Each apartment features an open kitchen configuration equipped with built-in cabinetry, fitted appliances, and granite countertops. Bathrooms include modern shower cabins, dedicated jacuzzis, and an electric water heater supplying continuous hot water. Living areas are completed with ceramic tile flooring, a mix of aluminum and PVC windows, and private balconies or terraces.
Resident wellness amenities, pool, and leisure spaces
The development provides dedicated relaxation and sports facilities centered around an outdoor swimming pool with cold shower areas. Indoor wellness options include a traditional Turkish hamam, a sauna, and a fully equipped fitness room. For sports and entertainment, residents have access to an on-site bowling alley and table tennis tables. Outdoor grounds include communal gardens, private garden zones, shaded gazebos, and a barbecue area, alongside dedicated indoor playrooms and outdoor playgrounds for children.
Exact distances to the sea and Antalya Airport
The development is situated 500 m from the sea, allowing direct access to the coastal waterfront. For air travel, Antalya Airport is located 1500 km from the property.
Two-block building structure and grounds across 10,500 sqm
The development consists of two residential blocks rising 12 storeys above a 10,500 sqm land parcel. Building circulation is served by elevators and an entrance lobby. On-site security operates 24/7 with comprehensive security camera monitoring across the grounds. Vehicle parking is accommodated through an on-site parking lot and an enclosed garage.
FAQ
When did construction begin and when was the project completed?
Construction on the development started on December 31, 2021, and reached completion on December 29, 2024.
Which heating and backup utility systems are installed?
The project is supplied with natural gas infrastructure and features an on-site generator to ensure uninterrupted electrical power.